Office fit out case study - BOC, Rotherham

By Airmaster Air Conditioning Ltd
schedule30th Aug 24

Airmaster successfully completed the installation of air conditioning over two floors at BOC in Brinsworth, Rotherham.

Fit-Out Contractor: The DL Company, Sheffield

They installed multiple inverter-driven R32 cassette DX split systems. These cassettes were placed in the ceiling grid within the offices, training rooms and cellular spaces to provide independent heating or
cooling for the area where the user is working via a wall-mounted remote controller.

The installation included all interconnecting containment, refrigerant pipework, thermal insulation, controls wiring and condensate drainage. The condensers for the systems were located externally at the rear
ground level of the building for ease of servicing. 

Remote controllers were installed for each system to provide independent heating or cooling for the area where the user is working.

The project was handed over with a user demonstration, O&M manual and commissioning certificates for ease of future maintenance and referencing. 

The R32 systems installed offer a lower GWP (Global Warming Potential) compared to comparable R410a VRF systems—675 compared to 2088—which means they have a lower potential to contribute to climate change, making them a more sustainable choice.

Client Testimonial:

"The DL Company (Fit-out Contractor) offered a professional installation to a high standard. The initial proposal helped demonstrate layout options. The level of detail for the costs allowed for confidence in the proposal and final cost structures. Value was at the heart of the design, delivered on time and to budget. We would recommend DL for further schemes."  Sally Williams, Head of Finance, BOC Limited, A Linde Company.